Residential Development Progress Monitoring

Construction · Residential site development · 2025

From finished streets to active homebuilding

Residential Development Progress Monitoring — July 2024July 2024May 2025

Mapped change across the full site

Drag the divider to compare pixel-aligned, north-up orthomosaics from the opening and final mapping missions. The shared footprint makes new streets, lots and vertical construction directly readable across the development.

Residential Development Progress Monitoring orthomosaic — October 2023October 2023May 2025

Project milestones

October 2023 — Baseline documentation captures the existing subdivision and the first active earthwork areas.
October 2023 — Baseline documentation captures the existing subdivision and the first active earthwork areas.
February 2024 — Mass grading expands across the next residential phase, with equipment and aggregate staged at the site entrance.
February 2024 — Mass grading expands across the next residential phase, with equipment and aggregate staged at the site entrance.
May 2024 — Rough road alignment, drainage and utility preparation become visible across the graded lots.
May 2024 — Rough road alignment, drainage and utility preparation become visible across the graded lots.
July 2024 — New streets, curbs and the first cul-de-sac establish the permanent circulation network.
July 2024 — New streets, curbs and the first cul-de-sac establish the permanent circulation network.
November 2024 — Paving extends through the development while finished lots are stabilized for vertical construction.
November 2024 — Paving extends through the development while finished lots are stabilized for vertical construction.
May 2025 — The first homes rise along the completed road network, documenting the transition from sitework to active building construction.
May 2025 — The first homes rise along the completed road network, documenting the transition from sitework to active building construction.

A nineteen-month aerial record of a residential development, presented through six comparable milestones and matched opening-to-final orthomosaics from October 2023 to May 2025. Repeated site capture documents the progression from early earthwork and mass grading through utilities, paving, lot stabilization and the first homes under construction. Consistent site-facing views communicate field conditions quickly, while the north-up maps make changes across the entire development directly comparable.